FANDOM



Description Edit

  • Pilot duty at Lackenby Steelworks. Shunt steel wagons into the correct sidings ready for mainline freight services.

Task Log and Objectives Edit

  • Welcome to Lackenby Steelworks. Molten steel is formed into steel slabs, coils and beams here. Today you're on shunting duty, shunting both empty and loaded steel wagons into the Grid Sidings. Start up the Class 08 in front of you.
  • CLIMB ABOARD. Climb aboard and sit in the Driver's Seat
  • DIESEL ENGINE. Hold the Master Key Switch to ON
  • CHARGE BRAKE SYSTEM. Wait for the Main Reservoir to charge...
  • HANDBRAKE. Fully release the Handbrake
  • BRAKE TEST. Set the Train Brake to FULL SERVICE
  • BRAKE TEST. Set the Locomotive Brake to FULL SERVICE
  • BRAKE TEST. Set the Train Brake to RUNNING
  • REVERSER. Set the Reverser to REVERSE
  • LOCOMOTIVE BRAKE. Set the Locomotive brake to RELEASE
  • APPLY POWER. Apply some Throttle and get up to speeds above 0
  • There are empty steel wagons waiting at Grid Siding Four. Collect these and deliver them to the Beam Mill Sidings to be loaded up later.
  • STOP AT LOCATION. Lackenby Grid Siding East Entry
  • Lackenby Grid Sidings include manual junctions, ensure these are set correctly before [proceeding in and out of the sidings.
  • SET JUNCTION. Set the Junction to enter the siding
  • STOP AT LOCATION. Lackenby No.4 Grid Sidings
  • Now couple up to these wagons. Pull up so the locomotive touches the wagons, then climb down and hook the couplings together manually.
  • COUPLE TO FORMATION. Empty steel wagons
  • STOP AT LOCATION. Lackenby Beam Mill Sidings
  • UNCOUPLE VEHICLES. Empty steel wagons
  • Loaded steel wagons are waiting in the adjacent siding, shunt this into Grid Siding Three, ready to be added to a service later in the day.
  • STOP AT LOCATION. Lackenby Beam Mill Sidings
  • COUPLE TO FORMATION. Loaded steel wagons
  • STOP AT LOCATION. Lackenby Grid Siding East Entry
  • STOP AT LOCATION. Lackenby No.3 Grid Sidings
  • UNCOUPLE VEHICLES. Loaded steel wagons
  • Nearby are a rake of steel wagons loaded with coils. Shunt these to the far sidings and couple tehm to the rear of the service that's just arrived.
  • STOP AT LOCATION. Lackenby No.3 Grid Sidings
  • COUPLE TO FORMATION. Loaded steel wagons
  • STOP AT LOCATION. Lackenby No.3 Grid Sidings
  • COUPLE TO FORMATION. Loaded steel wagons
  • UNCOUPLE VEHICLES. Loaded steel wagons
  • That looks to be all for now, return the Class 08 back to Lackenby Siding.
  • STOP AT LOCATION. Lackenby Grid Siding East Entry
  • STOP AT LOCATION. Lackenby Siding
  • SHUT DOWN LOCOMOTIVE. Set the Reverser to OFF
  • MASTER KEY SWITCH. Set the Master Key Switch to OFF
  • DISEMBARK. Climb down to complete this duty
Tees Valley Line
Locomotives BR Class 08 - BR Class 37 - BR Class 101
Rolling Stock BBA Wagon - HEA Hopper
Locations Darlington - Middlesbrough - Saltburn
Operators British Rail
Tutorials Class 37 Introduction - Class 101 Introduction (TVL) - Class 08 Introduction (TVL)
Scenarios Tubeliner Diversion - Coal Hauler - Steelworks Shunting - Three Becomes Two - Seaside Summer Special
Community content is available under CC-BY-SA unless otherwise noted.